Our End-of-Life Model turns a capacity plan or an asset register into a retirement schedule, a decommissioning line for the total cost of ownership, a residual-value sensitivity and embodied carbon avoided. This is what it produces for an illustrative 150 MW AI gigafactory.

First retirements
2030
Accelerator racks retiring in the 5-year TCO
733
Decommissioning in the TCO
€7.3m
Net resale in the TCO, sensitivity
€136m to €340m

Illustrative: 150 MW installed between 2028 and 2032, refreshed every two years, with a fifth of accelerators redeployed for two more years. Figures are not a forecast for any project.

Continuous refresh means retirements every year

With annual adoption of new GPU generations, hardware starts leaving the site within two years of going live, so some of it retires inside a five-year total cost of ownership.

Racks retiring each year, 2028 to 2040Stacked bars by the year capacity was installed, plus CPU, storage and network racks. Totals: 2028 0, 2029 0, 2030 160, 2031 160, 2032 413, 2033 200, 2034 773, 2035 240, 2036 853, 2037 200, 2038 867, 2039 200, 2040 840. The first five years form the TCO window.5-year TCO window025050075010002028202916020301602031413203220020337732034240203585320362002037867203820020398402040Racks retiring
  • 2028 capacity
  • 2029 capacity
  • 2030 capacity
  • 2032 capacity
  • CPU, storage and network racks
Show the data
Year2028 capacity2029 capacity2030 capacity2032 capacityCPU, storage and network racksTotal
2028 (TCO)000000
2029 (TCO)000000
2030 (TCO)1600000160
2031 (TCO)0160000160
2032 (TCO)200021300413
20330200000200
2034200026726740773
203502000040240
2036200026733353853
20370200000200
2038200026733367867
20390200000200
2040200026733340840

A small cost in the TCO, a large value in the sensitivity

Decommissioning is a fully costed line paid at every refresh. Resale value stays out of the base case and is shown as a sensitivity, net of selling costs and the provider's share.

Inside the 5-year TCODecommissioning, paid in every case: €7.3m; Net resale, low case (10%): €136m; Net resale, high case (25%): €340m.Decommissioning, paid in every case€7.3mNet resale, low case (10%)€136mNet resale, high case (25%)€340m
Retirements inside the 5-year TCO only. Decommissioning at EUR 10,000 per liquid-cooled rack and EUR 4,000 per air-cooled rack, and EUR 20m of accelerator hardware per MW, are placeholders until replaced by partner rates and the owner's CAPEX.

The questions boards and lenders ask, answered in minutes

Each line changes one input. Owners run the same tests on their own figures, including the sensitivities lenders and investment committees ask for.

ScenarioFirst retirementsRacks retiring in the TCODecommissioning in the TCONet resale, low / high
Base: 2-year refresh, 150 MW by 20322030733€7.3m€136m / €340m
3-year refresh instead of 22031320€3.2m€59m / €148m
Phase 1 only: the first 30 MW2030360€3.6m€67m / €167m
Later start: TCO window 2029 to 20332030933€9.3m€173m / €432m
High case at 40% residual, not 25%2030733€7.3m€136m / €543m

Carbon that stays in use

On low-carbon power, the hardware's embodied carbon is a large share of the footprint. Every accelerator that is reused instead of replaced keeps its manufacturing emissions in service.

Method: accelerators reused or resold × the manufacturer's published product carbon footprint per accelerator (NVIDIA HGX B200 summary, ISO 14067, baseboard share). A lower bound: it excludes the rest of the server.

Accelerators reused in the TCO window
42,221
Embodied carbon kept in use
12,000 tCO2e

What goes in, what comes out

The model works from a capacity plan before procurement, or from an asset register by serial number once hardware is live.

You provide

  • Capacity by year and site, or an asset register by serial number
  • Your refresh cycle and second-life use
  • Rack and system design
  • Your TCO window
  • CAPEX, with ITAD rates and market cases from us

You receive

  • Retirement schedule by year, generation and serial number
  • Decommissioning line inside and beyond the TCO
  • Residual-value sensitivity, net of costs and shares
  • Embodied carbon avoided through reuse
  • Figures ready for a bid, a lender or a board paper

Interactive demo

Try it yourself

Sign in with your work email and change the refresh cycle, capacity, timing and resale cases on an illustrative AI gigafactory. Clients run the same model on their own capacity plan or asset register through the secure portal; files are processed in memory and not stored.